search
Southwark, GB

NEO Bankside

NEO Bankside
NEO Bankside
NEO Bankside
NEO Bankside
NEO Bankside

Schöck and Waterman meet structural challenges at NEO Bankside.

The entire construction presented significant structural challenges and protection against thermal bridging was a priority. This is where Schöck played a major part with its Isokorb® thermal break. For the NEO Bankside project, various configurations of the type K Isokorb®, for concrete-to-concrete construction were incorporated, plus the type KST. This is usually a steel-to-steel connection, but has been adapted on this occasion for concrete-to-steel connectivity. The two main structural challenges involved the winter gardens and the level above, the penthouse mezzanine winter gardens.

Architect

Rogers Stirk Harbour + Partners (RSHP)