Bole®
type U

Reinforcement element to prevent punching shear failure in flat slabs or foundation slabs. For installation before laying the bottom layer of reinforcement.

Advantages

  • Tested safety

    A European Technical Assessment (ETA) is available for the product

     

  • Straightforward planning

    Design program to Eurocode 2

     

  • Supplied ready to install

    Quick and convenient with ready-to-install punching shear reinforcement

     

  • Reliable installation

    Best possible positional accuracy of the stud thanks to punching shear strips, indicator lug on the first stud with precise type designation and (if required) position designation

     

  • Individual adjustment

    Spacers on the punching shear reinforcement achieve the necessary concrete cover