This is an animation to show the concept and installation of Schöck Isokorb® type K thermal break connection for reinforced concrete to reinforced concrete.
This video shows you how fast and safe it is to install the Schöck Isokorb® - the most advanced, high performance thermal break element with over 10 million units installed since its introduction in 1983.
A 36 ton truck drives with 80 km/h (50mph) and an angle of 15° into a barrier. This 1,05m PL-3 (TL-5) concrete barrier is connected to the bridge deck through a unique construction using solely corrosion free ComBAR® headed and straight bars. The concrete strength was 25MPa. The result is a secure durable and economical solution.